  "id": "puct-59315",
  "name": "Dinosaur\u2013Longshore 765 kV (Route 559)",
  "type": "Transmission",
  "operator": "Oncor",
  "counties": "Brown; Callahan; Coke; Coleman; Comanche; Erath; Glasscock; Hood; Howard; Runnels; Somervell; Sterling; Taylor",
  "miles": 242.6,
  "stage": "Route approved \u2013 easement acquisition starting",
  "notes": "PUCT Docket 59315 approved Aug 28, 2026; rehearing motions pending. ~200 ft easement. Target in service 2028.",
  "source_url": "https://nationalrow.com/projects/oncor-765kv/",
  "source2": "https://www.dawsonsodd.com/current-eminent-domain-projects-texas/",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "puct-59029",
  "name": "Longshore\u2013Drill Hole 765 kV (Route 476)",
  "type": "Transmission",
  "operator": "Oncor",
  "counties": "Andrews; Culberson; Ector; Howard; Loving; Martin; Reeves; Winkler",
  "miles": 181.6,
  "stage": "Route approved \u2013 easement acquisition starting",
  "notes": "PUCT Docket 59029 approved Aug 28, 2026; rehearing motions pending. Target in service 2029.",
  "source_url": "https://nationalrow.com/projects/oncor-765kv/",
  "source2": "https://www.dawsonsodd.com/current-eminent-domain-projects-texas/",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "puct-59336",
  "name": "Howard\u2013Solstice 765 kV (Modified Route 4)",
  "type": "Transmission",
  "operator": "AEP Texas / CPS Energy",
  "counties": "14 counties as filed, SW Bexar to Pecos (route moved north of Uvalde County)",
  "miles": 370,
  "stage": "Route approved \u2013 pre-acquisition",
  "notes": "PUCT Docket 59336; Modified Route 4 selected Sep 11, final order Sep 18, 2026; rehearing motions filed. Miles approximate (as filed).",
  "source_url": "https://nationalrow.com/projects/texas-765kv/",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "puct-59182",
  "name": "Big Hill\u2013Sand Lake 765 kV",
  "type": "Transmission",
  "operator": "Oncor / LCRA TSC",
  "counties": "Crane; Crockett; Ector; Irion; Pecos; Reagan; Reeves; Schleicher; Tom Green; Upton; Ward; Winkler",
  "miles": null,
  "stage": "Routing \u2013 remanded to SOAH",
  "notes": "PUCT Docket 59182; ~197\u2013222 mi depending on route; remanded to SOAH Sep 18, 2026.",
  "source_url": "https://nationalrow.com/projects/oncor-765kv/",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "puct-59475",
  "name": "Bell County East\u2013Big Hill 765 kV",
  "type": "Transmission",
  "operator": "Oncor / LCRA TSC",
  "counties": "Bell; Burnet; Concho; Coryell; Lampasas; Llano; Mason; McCulloch; Menard; Milam; San Saba; Schleicher; Tom Green; Williamson",
  "miles": null,
  "stage": "Routing \u2013 remanded to SOAH",
  "notes": "PUCT Docket 59475; ~214\u2013244 mi depending on route; remanded to SOAH Sep 18, 2026.",
  "source_url": "https://nationalrow.com/projects/oncor-765kv/",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "southern-spirit",
  "name": "Southern Spirit HVDC Transmission",
  "type": "Transmission (HVDC)",
  "operator": "Pattern Energy",
  "counties": "Rusk (TX start); continues through Louisiana to Mississippi",
  "miles": 320,
  "stage": "Development \u2013 interconnection study",
  "notes": "320 mi total, mostly outside Texas. ERCOT issued an interconnection-study RFP in May 2026.",
  "source_url": "https://patternenergy.com/projects/southern-spirit-transmission/",
  "source2": "https://www.ercot.com/files/rfps/2026/05/15/Southern-Spirit-DC-Tie-Interconnection-Study_05-26_JT_RFP_Public.pdf",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "eiger",
  "name": "Eiger Express Pipeline",
  "type": "Pipeline (gas transmission)",
  "operator": "WhiteWater (WWM Operating)",
  "counties": "Austin; Burnet; Concho; Crane; Irion; Lampasas; Lee; Martin; McCulloch; Midland; Pecos; Reagan; San Saba; Tom Green; Upton; Waller; Washington; Wharton; Williamson",
  "miles": 610.45,
  "stage": "Easement acquisition",
  "row_firm": "Norfleet (per landowner attorney, txcondemnationrights.com)",
  "notes": "~450 mi mainline; RRC T-4 permit 10730 lists 610.45 permitted miles incl. laterals. 50 ft permanent + ~75 ft workspace. Construction expected 2027, service mid-2028.",
  "source_url": "https://txcondemnationrights.com/whitewaters-eiger-pipeline-initial-offers-stakeholder-meetings-and-knowing-the-scope-on-your-property/",
  "source2": "https://eigerpipeline.com/faqs-%26-resources",
  "date_found": "2026-10-18"
 },
 {
  "id": "blackcomb",
  "name": "Blackcomb Pipeline",
  "type": "Pipeline (gas transmission)",
  "operator": "WhiteWater (WWM Operating)",
  "counties": "Crockett; Dimmit; Duval; Jim Wells; Kinney; La Salle; Martin; Maverick; McMullen; Midland; Nueces; Reagan; Upton; Val Verde; Zavala",
  "miles": 453.16,
  "stage": "Construction \u2013 startup expected late 2026",
  "notes": "42-in, 2.5 Bcf/d Permian to Agua Dulce; Wood Mackenzie estimated mainline 63% complete in May 2026. Watch for damage/restoration work.",
  "source_url": "https://blackcombpipeline.com/",
  "source2": "https://www.woodmac.com/news/opinion/the-blackcomb-question-can-the-pipeline-reach-its-full-2.5-bcfd-capacity-at-startup",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "desert-sw",
  "name": "Desert Southwest Expansion",
  "type": "Pipeline (gas transmission, interstate)",
  "operator": "Energy Transfer (Transwestern)",
  "counties": "Winkler; Loving; Reeves (TX receipt area); then NM and AZ",
  "miles": 520,
  "stage": "FERC pre-filing \u2013 routing/surveys",
  "notes": "FERC Docket PF26-9 (pre-filing approved Apr 3, 2026). ~520 mi of 48-in mainline + ~186 mi of laterals, mostly NM/AZ. Target capacity 4Q 2029.",
  "source_url": "https://ferc.gov/desert-southwest-expansion-project",
  "source2": "https://desertsouthwest.com/overview/",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "dela",
  "name": "DeLa Express (reconfiguring as intrastate)",
  "type": "Pipeline (gas transmission)",
  "operator": "Moss Lake Partners",
  "counties": "Originally 27 Texas counties (Permian to SE Texas); new route TBD",
  "miles": null,
  "stage": "Suspended / re-scoping",
  "notes": "FERC pre-filing suspended Aug 2026; developer says it will pursue a Texas intrastate line, service targeted for 2030. Watch for new land-agent contact.",
  "source_url": "https://www.undergroundinfrastructure.com/news/2026/august/dela-express-pipeline-suspended-as-developer-pursues-intrastate-route",
  "source2": "https://www.ferc.gov/dela-express-pipeline-project",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "tx-access",
  "name": "Texas Access Project",
  "type": "Pipeline (gas transmission, interstate)",
  "operator": "Kinder Morgan Louisiana Pipeline",
  "counties": "Jefferson (TX); Cameron & Calcasieu Parishes (LA)",
  "miles": 3.05,
  "stage": "FERC environmental review (EA issued)",
  "notes": "FERC Docket CP26-136; EA comment deadline Oct 19, 2026. Small mileage, includes a 0.99-mi HDD under the Sabine-Neches Waterway.",
  "source_url": "https://www.federalregister.gov/documents/full_text/html/2026/09/23/2026-19445.html",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-002",
  "name": "Hugh Brinson Pipeline (42-in)",
  "type": "Pipeline (gas transmission)",
  "operator": "Energy Transfer Company",
  "counties": "Callahan; Eastland; Ellis; Erath; Glasscock; Hood; Johnson; Midland; Mitchell; Nolan; Somervell; Sterling; Taylor; Upton",
  "miles": 325.0,
  "stage": "Construction notice filed; Phase I reported in service Oct 2026",
  "notes": "42-in natural gas transmission; RRC PS-48 26-NC-002, received 1/8/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "9/1/2025",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18",
  "source2": "https://hughbrinsonpipeline.com/the-project/"
 },
 {
  "id": "rrc-26-NC-008",
  "name": "MBTC Pipeline",
  "type": "Pipeline (liquids transmission)",
  "operator": "ONEOK NGL Pipeline, LLC",
  "counties": "Chambers; Galveston",
  "miles": 45.0,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 3/16/2026",
  "notes": "24-in hazardous liquid transmission; RRC PS-48 26-NC-008, received 1/12/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "3/16/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-009",
  "name": "Big Spring Pipeline",
  "type": "Pipeline (gathering)",
  "operator": "Enterprise Products Operating LLC",
  "counties": "Glasscock; Howard; Martin",
  "miles": 33.33,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 4/1/2026",
  "notes": "24-in natural gas gathering; RRC PS-48 26-NC-009, received 1/13/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "4/1/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-032",
  "name": "Traverse Pipeline (42-in)",
  "type": "Pipeline (gas transmission)",
  "operator": "WWM Operating, LLC",
  "counties": "Calhoun; Jackson; Nueces; Refugio; San Patricio; Victoria; Wharton",
  "miles": 152.1,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 5/1/2026",
  "notes": "42-in natural gas transmission; RRC PS-48 26-NC-032, received 2/6/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "5/1/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-050",
  "name": "Freer 20-in Pipeline",
  "type": "Pipeline (gas transmission)",
  "operator": "Kimmeridge Texas Gas, LLC",
  "counties": "Duval; McMullen",
  "miles": 19.02,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 5/10/2026",
  "notes": "20-in natural gas transmission; RRC PS-48 26-NC-050, received 3/7/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "5/10/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-059",
  "name": "LGD-C Blending to Pembrook (36-in)",
  "type": "Pipeline (gas transmission)",
  "operator": "Buffalo Run Pipeline LLC",
  "counties": "Glasscock; Midland; Reagan; Upton",
  "miles": 30.03,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 9/7/2026",
  "notes": "36-in natural gas transmission; RRC PS-48 26-NC-059, received 3/12/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "9/7/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-061",
  "name": "Atmos Line DE (36-in)",
  "type": "Pipeline (gas transmission)",
  "operator": "Atmos Pipeline - Texas",
  "counties": "Henderson",
  "miles": 22.4,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 5/15/2026",
  "notes": "36-in natural gas transmission; RRC PS-48 26-NC-061, received 3/13/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "5/15/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-096",
  "name": "Chevron Power Lateral (36-in)",
  "type": "Pipeline (gas transmission)",
  "operator": "WWM Operating, LLC",
  "counties": "Pecos; Reeves",
  "miles": 22.23,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 7/1/2026",
  "notes": "36-in natural gas transmission; RRC PS-48 26-NC-096, received 4/17/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "7/1/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-098",
  "name": "DBR Expansion (42-in)",
  "type": "Pipeline (gas transmission)",
  "operator": "WWM Operating, LLC",
  "counties": "Loving; Pecos; Reeves; Ward",
  "miles": 53.54,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 7/1/2026",
  "notes": "42-in natural gas transmission; RRC PS-48 26-NC-098, received 4/20/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "7/1/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-103",
  "name": "Pickton Gas Storage North",
  "type": "Pipeline (gas transmission)",
  "operator": "Pickton Gas Storage LLC",
  "counties": "Delta; Lamar; Hopkins",
  "miles": 42.0,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 9/15/2026",
  "notes": "24-in natural gas transmission; RRC PS-48 26-NC-103, received 4/23/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "9/15/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-119",
  "name": "Sweeny to Texas City",
  "type": "Pipeline (liquids transmission)",
  "operator": "Marathon Pipe Line LLC",
  "counties": "Brazoria; Galveston",
  "miles": 64.3,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 7/13/2026",
  "notes": "20-in hazardous liquid transmission; RRC PS-48 26-NC-119, received 5/8/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "7/13/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-134",
  "name": "Luna Discharge",
  "type": "Pipeline (gathering)",
  "operator": "EnLink Permian, LLC",
  "counties": "Glasscock; Reagan",
  "miles": 28.0,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 7/25/2026",
  "notes": "20-in natural gas gathering; RRC PS-48 26-NC-134, received 5/26/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "7/25/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-141",
  "name": "Sundance to Butler HP 24-in",
  "type": "Pipeline (gathering)",
  "operator": "Brazos Midland Gas, LLC",
  "counties": "Martin; Midland",
  "miles": 46.0,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 7/6/2026",
  "notes": "24-in natural gas gathering; RRC PS-48 26-NC-141, received 6/1/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "7/6/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-158",
  "name": "Cayman Pipeline (HGC-BC)",
  "type": "Pipeline (liquids transmission)",
  "operator": "Targa NGL Pipeline Company LLC",
  "counties": "Chambers; Harris",
  "miles": 27.0,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 10/1/2026",
  "notes": "30-in hazardous liquid transmission; RRC PS-48 26-NC-158, received 6/26/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "10/1/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-170",
  "name": "TTC Connector",
  "type": "Pipeline (gas transmission)",
  "operator": "TTC Connector, LLC",
  "counties": "Colorado; Wharton",
  "miles": 24.8,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 8/3/2026",
  "notes": "20-in natural gas transmission; RRC PS-48 26-NC-170, received 7/14/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "8/3/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-204",
  "name": "Pinnacle Connector Loop",
  "type": "Pipeline (gathering)",
  "operator": "Kinetik Holdings LP",
  "counties": "Culberson; Reeves",
  "miles": 17.1,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 12/31/2026",
  "notes": "20-in natural gas gathering; RRC PS-48 26-NC-204, received 8/18/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "12/31/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-206",
  "name": "Hubbard Lateral (30-in)",
  "type": "Pipeline (gas transmission)",
  "operator": "WTG Hubbard Transmission, LLC",
  "counties": "Ellis; Hill; Navarro",
  "miles": 39.14,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 4/1/2027",
  "notes": "30-in natural gas transmission; RRC PS-48 26-NC-206, received 8/20/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "4/1/2027",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-207",
  "name": "Monahans Utility Lateral",
  "type": "Pipeline (gas transmission)",
  "operator": "WWM Operating, LLC",
  "counties": "Ward",
  "miles": 16.95,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 11/26/2026",
  "notes": "20-in natural gas transmission; RRC PS-48 26-NC-207, received 8/21/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "11/26/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-208",
  "name": "Y20 Pipeline",
  "type": "Pipeline (gathering)",
  "operator": "James Lake Midstream LLC",
  "counties": "Andrews; Ector",
  "miles": 23.65,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 8/31/2026",
  "notes": "20-in natural gas gathering; RRC PS-48 26-NC-208, received 8/21/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "8/31/2026",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-220",
  "name": "24-in RBO to WT2 Loop Line",
  "type": "Pipeline (liquids transmission)",
  "operator": "Energy Transfer Company",
  "counties": "Loving; Winkler",
  "miles": 39.15,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 2/15/2027",
  "notes": "24-in hazardous liquid transmission; RRC PS-48 26-NC-220, received 9/1/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "2/15/2027",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 },
 {
  "id": "rrc-26-NC-221",
  "name": "Keanu to Yeti 30-in Loop",
  "type": "Pipeline (gathering)",
  "operator": "Targa Delaware LLC",
  "counties": "Ward; Winkler",
  "miles": 18.18,
  "stage": "Construction notice filed (RRC PS-48) \u2013 reported start 1/1/2027",
  "notes": "30-in natural gas gathering; RRC PS-48 26-NC-221, received 9/2/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.",
  "source_url": "https://www.rrc.texas.gov/media/slyfbohn/pdf_2026-cy-pipeline-construction_sept18-2026.pdf",
  "ps48_start": "1/1/2027",
  "row_firm": "Not publicly known",
  "date_found": "2026-10-18"
 }
]