Dinosaur–Longshore 765 kV (Route 559)
Transmission
OncorBrown; Callahan; Coke; Coleman; Comanche; Erath; Glasscock; Hood; Howard; Runnels; Somervell; Sterling; Taylor242.6 Easement acquisition
Route approved – easement acquisition starting
Not publicly known PUCT Docket 59315 approved Aug 28, 2026; rehearing motions pending. ~200 ft easement. Target in service 2028.Source · 2
found 2026-10-18
Longshore–Drill Hole 765 kV (Route 476)
Transmission
OncorAndrews; Culberson; Ector; Howard; Loving; Martin; Reeves; Winkler181.6 Easement acquisition
Route approved – easement acquisition starting
Not publicly known PUCT Docket 59029 approved Aug 28, 2026; rehearing motions pending. Target in service 2029.Source · 2
found 2026-10-18
Howard–Solstice 765 kV (Modified Route 4)
Transmission
AEP Texas / CPS Energy14 counties as filed, SW Bexar to Pecos (route moved north of Uvalde County)370 Route approved
Route approved – pre-acquisition
Not publicly known PUCT Docket 59336; Modified Route 4 selected Sep 11, final order Sep 18, 2026; rehearing motions filed. Miles approximate (as filed).Source
found 2026-10-18
Big Hill–Sand Lake 765 kV
Transmission
Oncor / LCRA TSCCrane; Crockett; Ector; Irion; Pecos; Reagan; Reeves; Schleicher; Tom Green; Upton; Ward; Winkler— Planning / routing
Routing – remanded to SOAH
Not publicly known PUCT Docket 59182; ~197–222 mi depending on route; remanded to SOAH Sep 18, 2026.Source
found 2026-10-18
Bell County East–Big Hill 765 kV
Transmission
Oncor / LCRA TSCBell; Burnet; Concho; Coryell; Lampasas; Llano; Mason; McCulloch; Menard; Milam; San Saba; Schleicher; Tom Green; Williamson— Planning / routing
Routing – remanded to SOAH
Not publicly known PUCT Docket 59475; ~214–244 mi depending on route; remanded to SOAH Sep 18, 2026.Source
found 2026-10-18
Southern Spirit HVDC Transmission
Transmission (HVDC)
Pattern EnergyRusk (TX start); continues through Louisiana to Mississippi320 Planning / routing
Development – interconnection study
Not publicly known 320 mi total, mostly outside Texas. ERCOT issued an interconnection-study RFP in May 2026.Source · 2
found 2026-10-18
Eiger Express Pipeline
Pipeline (gas transmission)
WhiteWater (WWM Operating)Austin; Burnet; Concho; Crane; Irion; Lampasas; Lee; Martin; McCulloch; Midland; Pecos; Reagan; San Saba; Tom Green; Upton; Waller; Washington; Wharton; Williamson610.45 Easement acquisition
Easement acquisition
Norfleet (per landowner attorney, txcondemnationrights.com) ~450 mi mainline; RRC T-4 permit 10730 lists 610.45 permitted miles incl. laterals. 50 ft permanent + ~75 ft workspace. Construction expected 2027, service mid-2028.Source · 2
found 2026-10-18
Blackcomb Pipeline
Pipeline (gas transmission)
WhiteWater (WWM Operating)Crockett; Dimmit; Duval; Jim Wells; Kinney; La Salle; Martin; Maverick; McMullen; Midland; Nueces; Reagan; Upton; Val Verde; Zavala453.16 Construction
Construction – startup expected late 2026
Not publicly known 42-in, 2.5 Bcf/d Permian to Agua Dulce; Wood Mackenzie estimated mainline 63% complete in May 2026. Watch for damage/restoration work.Source · 2
found 2026-10-18
Desert Southwest Expansion
Pipeline (gas transmission, interstate)
Energy Transfer (Transwestern)Winkler; Loving; Reeves (TX receipt area); then NM and AZ520 Planning / routing
FERC pre-filing – routing/surveys
Not publicly known FERC Docket PF26-9 (pre-filing approved Apr 3, 2026). ~520 mi of 48-in mainline + ~186 mi of laterals, mostly NM/AZ. Target capacity 4Q 2029.Source · 2
found 2026-10-18
DeLa Express (reconfiguring as intrastate)
Pipeline (gas transmission)
Moss Lake PartnersOriginally 27 Texas counties (Permian to SE Texas); new route TBD— Planning / routing
Suspended / re-scoping
Not publicly known FERC pre-filing suspended Aug 2026; developer says it will pursue a Texas intrastate line, service targeted for 2030. Watch for new land-agent contact.Source · 2
found 2026-10-18
Texas Access Project
Pipeline (gas transmission, interstate)
Kinder Morgan Louisiana PipelineJefferson (TX); Cameron & Calcasieu Parishes (LA)3.05 Planning / routing
FERC environmental review (EA issued)
Not publicly known FERC Docket CP26-136; EA comment deadline Oct 19, 2026. Small mileage, includes a 0.99-mi HDD under the Sabine-Neches Waterway.Source
found 2026-10-18
Hugh Brinson Pipeline (42-in)
Pipeline (gas transmission)
Energy Transfer CompanyCallahan; Eastland; Ellis; Erath; Glasscock; Hood; Johnson; Midland; Mitchell; Nolan; Somervell; Sterling; Taylor; Upton325.0 Construction
Construction notice filed; Phase I reported in service Oct 2026
Not publicly known 42-in natural gas transmission; RRC PS-48 26-NC-002, received 1/8/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source · 2
found 2026-10-18
MBTC Pipeline
Pipeline (liquids transmission)
ONEOK NGL Pipeline, LLCChambers; Galveston45.0 Construction
Construction notice filed (RRC PS-48) – reported start 3/16/2026
Not publicly known 24-in hazardous liquid transmission; RRC PS-48 26-NC-008, received 1/12/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Big Spring Pipeline
Pipeline (gathering)
Enterprise Products Operating LLCGlasscock; Howard; Martin33.33 Construction
Construction notice filed (RRC PS-48) – reported start 4/1/2026
Not publicly known 24-in natural gas gathering; RRC PS-48 26-NC-009, received 1/13/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Traverse Pipeline (42-in)
Pipeline (gas transmission)
WWM Operating, LLCCalhoun; Jackson; Nueces; Refugio; San Patricio; Victoria; Wharton152.1 Construction
Construction notice filed (RRC PS-48) – reported start 5/1/2026
Not publicly known 42-in natural gas transmission; RRC PS-48 26-NC-032, received 2/6/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Freer 20-in Pipeline
Pipeline (gas transmission)
Kimmeridge Texas Gas, LLCDuval; McMullen19.02 Construction
Construction notice filed (RRC PS-48) – reported start 5/10/2026
Not publicly known 20-in natural gas transmission; RRC PS-48 26-NC-050, received 3/7/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
LGD-C Blending to Pembrook (36-in)
Pipeline (gas transmission)
Buffalo Run Pipeline LLCGlasscock; Midland; Reagan; Upton30.03 Construction
Construction notice filed (RRC PS-48) – reported start 9/7/2026
Not publicly known 36-in natural gas transmission; RRC PS-48 26-NC-059, received 3/12/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Atmos Line DE (36-in)
Pipeline (gas transmission)
Atmos Pipeline - TexasHenderson22.4 Construction
Construction notice filed (RRC PS-48) – reported start 5/15/2026
Not publicly known 36-in natural gas transmission; RRC PS-48 26-NC-061, received 3/13/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Chevron Power Lateral (36-in)
Pipeline (gas transmission)
WWM Operating, LLCPecos; Reeves22.23 Construction
Construction notice filed (RRC PS-48) – reported start 7/1/2026
Not publicly known 36-in natural gas transmission; RRC PS-48 26-NC-096, received 4/17/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
DBR Expansion (42-in)
Pipeline (gas transmission)
WWM Operating, LLCLoving; Pecos; Reeves; Ward53.54 Construction
Construction notice filed (RRC PS-48) – reported start 7/1/2026
Not publicly known 42-in natural gas transmission; RRC PS-48 26-NC-098, received 4/20/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Pickton Gas Storage North
Pipeline (gas transmission)
Pickton Gas Storage LLCDelta; Lamar; Hopkins42.0 Construction
Construction notice filed (RRC PS-48) – reported start 9/15/2026
Not publicly known 24-in natural gas transmission; RRC PS-48 26-NC-103, received 4/23/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Sweeny to Texas City
Pipeline (liquids transmission)
Marathon Pipe Line LLCBrazoria; Galveston64.3 Construction
Construction notice filed (RRC PS-48) – reported start 7/13/2026
Not publicly known 20-in hazardous liquid transmission; RRC PS-48 26-NC-119, received 5/8/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Luna Discharge
Pipeline (gathering)
EnLink Permian, LLCGlasscock; Reagan28.0 Construction
Construction notice filed (RRC PS-48) – reported start 7/25/2026
Not publicly known 20-in natural gas gathering; RRC PS-48 26-NC-134, received 5/26/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Sundance to Butler HP 24-in
Pipeline (gathering)
Brazos Midland Gas, LLCMartin; Midland46.0 Construction
Construction notice filed (RRC PS-48) – reported start 7/6/2026
Not publicly known 24-in natural gas gathering; RRC PS-48 26-NC-141, received 6/1/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Cayman Pipeline (HGC-BC)
Pipeline (liquids transmission)
Targa NGL Pipeline Company LLCChambers; Harris27.0 Construction
Construction notice filed (RRC PS-48) – reported start 10/1/2026
Not publicly known 30-in hazardous liquid transmission; RRC PS-48 26-NC-158, received 6/26/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
TTC Connector
Pipeline (gas transmission)
TTC Connector, LLCColorado; Wharton24.8 Construction
Construction notice filed (RRC PS-48) – reported start 8/3/2026
Not publicly known 20-in natural gas transmission; RRC PS-48 26-NC-170, received 7/14/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Pinnacle Connector Loop
Pipeline (gathering)
Kinetik Holdings LPCulberson; Reeves17.1 Construction
Construction notice filed (RRC PS-48) – reported start 12/31/2026
Not publicly known 20-in natural gas gathering; RRC PS-48 26-NC-204, received 8/18/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Hubbard Lateral (30-in)
Pipeline (gas transmission)
WTG Hubbard Transmission, LLCEllis; Hill; Navarro39.14 Construction
Construction notice filed (RRC PS-48) – reported start 4/1/2027
Not publicly known 30-in natural gas transmission; RRC PS-48 26-NC-206, received 8/20/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Monahans Utility Lateral
Pipeline (gas transmission)
WWM Operating, LLCWard16.95 Construction
Construction notice filed (RRC PS-48) – reported start 11/26/2026
Not publicly known 20-in natural gas transmission; RRC PS-48 26-NC-207, received 8/21/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Y20 Pipeline
Pipeline (gathering)
James Lake Midstream LLCAndrews; Ector23.65 Construction
Construction notice filed (RRC PS-48) – reported start 8/31/2026
Not publicly known 20-in natural gas gathering; RRC PS-48 26-NC-208, received 8/21/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
24-in RBO to WT2 Loop Line
Pipeline (liquids transmission)
Energy Transfer CompanyLoving; Winkler39.15 Construction
Construction notice filed (RRC PS-48) – reported start 2/15/2027
Not publicly known 24-in hazardous liquid transmission; RRC PS-48 26-NC-220, received 9/1/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18
Keanu to Yeti 30-in Loop
Pipeline (gathering)
Targa Delaware LLCWard; Winkler18.18 Construction
Construction notice filed (RRC PS-48) – reported start 1/1/2027
Not publicly known 30-in natural gas gathering; RRC PS-48 26-NC-221, received 9/2/2026. By PS-48 stage most easements are usually signed; look for construction-phase ROW, damages and restoration work.Source
found 2026-10-18